Project Name: |
Bay Front Park |
|
Product: |
Gravelpave2 |
Gravelpave2 filled with aggregate and topped with sand to blend in with the beach.The Fire lane is expanded with the use of Gravelpave2.
The Entrance to Bay Front Park.
|
Application: |
Utility Access and Fire Lane |
City: |
Miami |
State/Province: |
Florida |
Install Date:
|
November 2009 |
Install Size:
|
150 m2 (1600 sq ft) |
Address:
|
301 North Biscayne Blvd Miami, Fl |
Client: |
City of Miami |
Designer: |
Dick Rogers of Curtis & Rogers
3250 Mary Street, Suite 301, Coconut Grove, Miami, Fl 33133
305 442-1774 |
Contractor: |
Pablo Gonzalez With Concrete Works & Pavers 305 256-5699 |
Directions: |
301 North Biscayne Blvd Miami, FL |
Location: |
Adjacent to the seawall on the East end of Park |
Photography: |
GAP Architectural Products, Inc. |
|
Bay Front Park sits between the Intracoastal Bay and Downtown Miami. It is on the same grounds as the Bayside Shopping Center, near the Shipping Port of Miami. The Gravelpave2 is adjacent to the seawall on the East end of Park. It is part of the sandy beach area. Gravelpave2 was filled with a stone aggregate, then topped with a layer of beach sand to simulate a beach environment. It is accessed by pedestrians, small utility carts as well as large emergency vehicles. |
Links: |
|
| |
Where to Buy - Find a rep or reseller
Submit an information request:
Grasspave2 Grass pavement - porous paver
Gravelpave2 Gravel permeable pavement
Rainstore3 underground stormwater detention
Slopetame2 erosion control system
Draincore2 subsurface drainage layer
Beachrings2 beach access mat |
|
|
|
|
| Invisible Structures, Inc. Home | ©2000-2009 Invisible Structures, Inc. |