Louisiana National Guard Multi Unit Readiness Center , Hammond, Louisiana
Project Name:
Louisiana National Guard Multi Unit Readiness Center
Click on an image to enlarge view
Product:
Grasspave2
The Parking lot is to the right when facing the Readiness Center’s entrance.


The Grasspave2 parking lot has a concrete border to separate the Grasspave2 from the unsupported turf.


Newly sodded area of the Grasspave2 parking lot.
Application:
Poruous Parking Lot
City:
Hammond
State/Province:
Louisiana
Install Date:
Fall 2008
Install Size:
6,830 square Meters (73,530 sq ft)
Address:
1501 Industrial Park Drive Hammond, Louisiana 70401
Client:
Louisiana National Guard
Designer:
Holly & Smith Architecture- Hammond, Louisiana
Contractor:
Richard Price Construction.- Walker, LA
Directions:
Take LA 3158 north off I- 12 to LA 190 go east to Industrial Park Drive then Turn left. Go to the Guard shack on the left (first concrete road to the left) GO .4 MILES after you go thru the guard shack and the building will be on your right.
Location:
The Grasspave2 parking lot is on the right when you are facing the building.
Photography:
Roger Tadlock, MKM Sales

Summary:


 


The large parking lot will house military and civilian automobiles. The LNG needed Grasspave2 to get the parking it required and also the stormwater management properties available from the grass porous paver.
Links:
http://invisiblestructures.com/grasspave2.html
 

Where to Buy - Find a rep or reseller
Submit an information request:
Grasspave2 Grass pavement - porous paver
Gravelpave2 Gravel permeable pavement
Rainstore3 underground stormwater detention
Slopetame2 erosion control system
Draincore2 subsurface drainage layer
Beachrings2 beach access mat


The grass area around the building would make a nice Grasspave2 firelane.

Here we see the concrete apron surrounding the Grasspave2 parking lot. The concrete and the Grasspave2 are very level in elevation.

Light post are easily integrated into a Grasspave2 parking area. Trees, shrubs, irrigation heads, and other items can also be easily integrated.

The 73,530 sq ft parking lot will also reduce the urban heat island effect through transpiration.